Question:

Which of the following is not a type of attribute chart?
  1. P chart
  2. C chart
  3. U char
  4. X bar chart






Q2. Example of prevention costs is:

  1. Quality improvement projects
  2. Downgrading
  3. To link outcomes to uses
  4. Warranty claims
Correct Answer

Q3. Quality practices must be carried out ______________

  1. at the start of the project
  2. throuout the life of the project
  3. at the end of the project
  4. no neeed to carry out quality practices
Correct Answer

Q4. From a high level perspective, quality:

  1. is ensured by having inspectors
  2. problems are usually caused by unmotivated employees
  3. cannot be quantitatively measured
  4. and productivity are inconsistent objectives
  5. is primarily (85 - 95%) a management problem
Correct Answer

Q5. ______________ are used in six sigma

  1. black belt
  2. green belt
  3. both black belt and green belt
  4. none of the Above
Correct Answer

Q6. Quality attributes

  1. are used to determine how effectively the organization accomplishes its goals
  2. can be objective or subjective in nature
  3. are specific quality characteristics for which a product is designed, built, and tested
  4. A and B
  5. B and C
Correct Answer

Q7. the job characteristic of quality professionals is:

  1. None of the above
  2. Educating others
  3. Achieving personal targets
  4. Consultative work with other departments
Correct Answer

Q8. Which set-up operation under SMED involves machine to stop for performing the operation

  1. internal
  2. External
  3. Functional clamps
  4. Intermediate jigs
Correct Answer

Q9. When conducting an ANOVA, the F-Value calculated from the data will always fall within what'range?

  1. between negative infinity and infinity
  2. between 0 and 1
  3. between 0 and infinity
  4. between 1 and infinity
Correct Answer

Q10. Cost of quality includes:

  1. Cost of all work resulting from nonconformance to the requirements
  2. a and b
  3. all of the above
  4. Cost of all work to build a product or service that conforms to the requirements
  5. Training programs
Correct Answer