Question:

Check the following statements for being applicable to JIT production systems
  1. JIT approaches can be contrasted with conventional approaches which advocate a pull approach.
  2. The flow of goods is controlled by a push approach.
  3. Marketing is scheduled just in time to generate customer orders.
  4. Raw materials are received just in time to go into production.






Q2. Check the following statements for being applicable to JIT production systems

  1. JIT approaches can be contrasted with conventional approaches which advocate a pull approach.
  2. The flow of goods is controlled by a push approach.
  3. Marketing is scheduled just in time to generate customer orders.
  4. Raw materials are received just in time to go into production.
Correct Answer

Q3. DMAIC is ______________

  1. develop, multiply, analyze, improve, check
  2. define, muliply, analyze, improve, control
  3. define, measure, analyze, improve, control
  4. define, manufacture, analyze, improve, control
Correct Answer

Q4. Failure Mode and Effects Analysis, which prioritizes different sources of error, is used in _________________ stage.

  1. Define
  2. Measure
  3. Improve
  4. Analyze
Correct Answer

Q5. Identify the charts which might give an indication of process going out of control (before the process has actually changed)

  1. X bar and c
  2. P and c
  3. R and u
  4. X bar and R
Correct Answer

Q6. If the Average outgoing Quality is plotted against the Incoming Fraction Defective, the Average Outgoing Quality Limit is the ______________ point.

  1. Highest
  2. Lowest
  3. Middle
  4. Cannot be determined
Correct Answer

Q7. Which is not listed as one of the eight wastes?

  1. Waiting
  2. Excess machine capacity
  3. Transporting
  4. Overproduction
Correct Answer

Q8. During experimental design, a variable is defined as:

  1. Treatment
  2. Factor
  3. Variance
  4. None of these
Correct Answer

Q9. Let there be a data set {200,201,202,203,204,205,206,207,208}. This data set can be represented using stem and leaf where the ______________ is 20 and the ______________ is {0,1,2,3,4,5,6,7,8}.

  1. Stem, Leaf
  2. Leaf, Stem
  3. Tree, Stem
  4. Tree, Leaf
Correct Answer

Q10. Check Sheet is used during ______________ stage of DMAIC.

  1. Define
  2. Measure
  3. Analyze
  4. Improve
Correct Answer