Random variance in a process, as measured by the standard deviation, can be directly reduced by:
  1. identifying patterns of variance using control charts
  2. improving the overall system of production
  3. increasing the number of quality inspectors
  4. making use of run charts
  5. making better use of Pareto charts






Q2. An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart?

  1. When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
  2. When the number of samples outside the current control chart limits become too costly and cumbersome to investigate
  3. When a process is subject to constant but stable tool wear
  4. A and B
  5. A and C
Correct Answer

Q3. Consider that for a particular process, the p has shifted to .4 and the process has gone out of control. The corresponding value of beta is found to be .3356. The value of Average Run Length is:

  1. 2.5
  2. 1.5 ((1/1-beta) provides us with average run length)
  3. 1.0
  4. 2.7
Correct Answer

Q4. The ______________ diagram starts with one item which then branches of into two or more items. This diagram is used to breakdown broad categories into finer levels of detail.

  1. Affinity
  2. Tree
  3. Relations
  4. Matrix
Correct Answer

Q5. The 'Father' of statistical quality control is:

  1. Joseph M. Juran
  2. Philip Crosby
  3. Walter Shewhart
  4. F. W. Taylor
Correct Answer

Q6. Which of the following is responsible for quality objective?

  1. Top level management
  2. Middle level management
  3. Frontline management
  4. All of the above
Correct Answer

Q7. The cost of quality has been argued as being primarily driven by the workers. When items were produced that did not meet the customers' expectations, the workers were "found" to be at fault. Current thinking is that management has at least ______________ percent of the responsibility for the cost of quality.

  1. 85
  2. 75
  3. 65
  4. 55
  5. 50
Correct Answer

Q8. The thickness of aluminum sheet is specified to be of 6±2 mm. The Upper Specification Limit and Lower Specification Limit for the sheet are:

  1. 4mm, 8mm
  2. 8mm, 4mm
  3. 6mm, 8mm
  4. 4mm, 6mm
Correct Answer

Q9. Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below ______________ defects per million opportunities (DPMO).

  1. 2
  2. 2.4
  3. 3
  4. 3.4
Correct Answer

Q10. The Japanese Quality Control (QC) Circle movement motivated its participants in many ways. Which of the following represents the most important motivation for the QC circle participant:

  1. Improving the performance of the company
  2. Self-Improvement
  3. Financial Incentives
  4. Recognition among co-workers
  5. Strengthening of relationships between co-workers
Correct Answer