IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

When errors that affect quality are discovered, the procedure to improve the situation should be to ______________.
  1. all of the above
  2. identify the specific error
  3. correct the specific error
  4. determine the root causes of the error
  5. correct the root cause of the error






Q2. The overall intentions and direction of an organization with regard to quality as formally expressed by top management is a:

  1. Quality Plan
  2. Quality Statement
  3. Quality Policy
  4. TQM
Correct Answer

Q3. Random variance in a process, as measured by the standard deviation, can be directly reduced by:

  1. identifying patterns of variance using control charts
  2. improving the overall system of production
  3. increasing the number of quality inspectors
  4. making use of run charts
  5. making better use of Pareto charts
Correct Answer

Q4. Cost of quality includes:

  1. Cost of all work resulting from nonconformance to the requirements
  2. a and b
  3. all of the above
  4. Cost of all work to build a product or service that conforms to the requirements
  5. Training programs
Correct Answer

Q5. The quality management tool that can be described as "a diagram that rank and displays defects in order of frequency of occurrence (from left to right)" is a:

  1. Pareto chart
  2. run chart
  3. control chart
  4. vertical bar chart
  5. histograms
Correct Answer

Q6. Quality control is:

  1. evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards
  2. taking action to increase the effectiveness and efficiency of the project so as to provide added benefits to both the performing organization and the project customer
  3. assuming the production of goods that meet the highest standards of luxury
  4. identifying which quality standards are relevant to the project and determining how to satisfy them
  5. monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance
Correct Answer

Q7. Which of the following is NOT true about the standard error of a statistic?

  1. The standard error measures, roughly, the average difference between the statistic and the population parameter.
  2. The standard error is the estimated standard deviation of the sampling distribution for the statistic.
  3. The standard error can never be a negative number.
  4. The standard error increases as the sample size(s) increases.
Correct Answer

Q8. A six sigma capable process will have

  1. Cp = 1.5, Cpk = 2.0 and DPMO = 3.4
  2. Cp = 2.0, Cpk = 1.5 and DPMO = 6
  3. Cp = 1.5 Cpk = 2.0 and DPMO = 6
  4. Cp = 2.0, Cpk = 1.5 and DPMO = 3.4
Correct Answer

Q9. The focal point of all quality control should be:

  1. Price focus
  2. Cost Focus
  3. Customer Focus
  4. Manufacturing Focus
Correct Answer

Q10. Plan-do-study-act cycle is a procedure to ______________

  1. Overall improvement
  2. Continuous improvement
  3. Permanent improvement
  4. Immediate improvement
Correct Answer










User Agreement| |Privacy Policy