Question:

Cost of quality includes:
  1. Cost of all work resulting from nonconformance to the requirements
  2. a and b
  3. all of the above
  4. Cost of all work to build a product or service that conforms to the requirements
  5. Training programs






Q2. Which of the following is the key benefit of multi-vari charting?

  1. It keeps track of the time when measurements were made
  2. It graphically displays the variation in a process
  3. It assists in the breakdown of components of variation
  4. It is much easier to plot than most control charts
Correct Answer

Q3. The 14-step process to quality improvement is a progressive to total involvement of everyone in a company toward the production of quality products and services. The 14-steps do not include ______________.

  1. management commitment
  2. quality improvement team
  3. quality measurement
  4. goal achievement measures
  5. supervisor training
Correct Answer

Q4. "Poka-yoke" is the Japanese term for ______________

  1. Card
  2. Mistake proof
  3. Continuous improvement
  4. Fishbone diagram
Correct Answer

Q5. A quality program within a project should be based on ______________ of errors to improve productivity along with quality levels.

  1. early detection
  2. early correction
  3. late detection
  4. late correction
  5. prevention
Correct Answer

Q6. The same quality control manager decides to increase his daily sample size from three to six. The size of the control band will:

  1. Increase
  2. Decrease
  3. Remain unchanged
  4. Not determinable from given data
  5. None of the above
Correct Answer

Q7. Which of the following is not a target of Total Quality Management:

  1. Customer Satisfaction
  2. Reducing manpower
  3. Continuous Cost Reduction
  4. Continuous Operational Improvement
Correct Answer

Q8. During experimental design, a variable is defined as:

  1. Treatment
  2. Factor
  3. Variance
  4. None of these
Correct Answer

Q9. Total quality costs include:

  1. Prevention costs
  2. Appraisal costs
  3. Failure costs
  4. All of the given options
Correct Answer

Q10. The primary responsibility for establishing design and test specifications should rest with

  1. manufacturing
  2. senior management
  3. procurement or purchasing
  4. engineering
  5. quality control
Correct Answer