When planning the quality management system, organisations shall consider the issues and requirements referred to in 4.1 and 4.2 and determine the risks and opportunities that need to be addressed to;
  1. enhance desirable effects
  2. achieve improvement
  3. give assurance that the quality management system can achieve its intended result(s)
  4. all of the above






Q2. fourteen points framework for quality and productivity improvement was suggested by ______________

  1. Crosby
  2. Ishikawa
  3. Deming
  4. Juran
Correct Answer

Q3. Which is not a commonly used quality management tool?

  1. Fishbone diagram
  2. CSSR report
  3. Pareto chart
  4. Control chart
  5. None of the above (all are commonly used)
Correct Answer

Q4. For a c chart, the LCL comes out to be -.7. The value of LCL that should be used is:

  1. -.7
  2. 0
  3. 1
  4. None of the above
Correct Answer

Q5. Assured quality is necessary for building customer confidence.

  1. correct
  2. correct to some extent
  3. correct to great extent
  4. incorrect
Correct Answer

Q6. In computing the cost of producing a quality product, the major areas of costs contribute to the sale price of the product. The ratio of the ______________ costs determine whether an effective program is fully implemented.

  1. direct, indirect, and overhead
  2. one-time, recurring, and variable
  3. variable, fixed, and semi-fixed
  4. prevention, appraisal, and failure
  5. build, repair, and test
Correct Answer

Q7. Which of the following is NOT true about the standard error of a statistic?

  1. The standard error measures, roughly, the average difference between the statistic and the population parameter.
  2. The standard error is the estimated standard deviation of the sampling distribution for the statistic.
  3. The standard error can never be a negative number.
  4. The standard error increases as the sample size(s) increases.
Correct Answer

Q8. An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart?

  1. When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
  2. When the number of samples outside the current control chart limits become too costly and cumbersome to investigate
  3. When a process is subject to constant but stable tool wear
  4. A and B
  5. A and C
Correct Answer

Q9. The acronym DMAIC stands for:

  1. Develop, Metrics, Analyze, Implement, Contain
  2. Define, Measure, Analyze, Improve, Control
  3. Define, Metrics, Analysis, Implement, Control
  4. None of the above
Correct Answer

Q10. Juran's Quality trilogy emphasizes the roles of quality planning, quality control and ______________

  1. Quality Definition
  2. Quality enhancement
  3. Quality improvement
  4. quality maintenance
Correct Answer