IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

Which is not a commonly used quality management tool?
  1. Fishbone diagram
  2. CSSR report
  3. Pareto chart
  4. Control chart
  5. None of the above (all are commonly used)






Q2. The first step in problem solving is to:

  1. Assume the worst.
  2. Establish responsibility for change.
  3. Collect and analyze data.
  4. Define the problem issue.
Correct Answer

Q3. The concept that states: "the optimal quality level is reached at the point where the incremental revenue from product improvement equals the incremental cost to secure it" comes from:

  1. quality control analysis
  2. marginal analysis
  3. standard quality analysis
  4. conformance analysis
  5. systems analysis
Correct Answer

Q4. An advertising executive is studying television-viewing habits of married men and women during prime time hours. On the basis of past viewing records, the executive has determined that during prime time, husbands are watching television 40% of the time. It has also been determined that when the husband is watching television, 40% of the time the wife is also watching. When the husband is not watching television, 30% of the time the wife is watching television. Find the probability that the wife is watching television in prime time.

  1. 0.36
  2. 0.35
  3. 0.34
  4. 0.32
Correct Answer

Q5. How does the current inventory is indicated visually?

  1. Bar chart
  2. Kanban card
  3. Stand up meeting
  4. Label
Correct Answer

Q6. The basic assumption of calculating the control limits based on average sample size (for a p chart) will ______________ from/as those previously observed.

  1. Greatly differ
  2. Will be exactly the same
  3. Not greatly differ
  4. None of the above
Correct Answer

Q7. The ______________ is used to identify what might go wrong in a plan under development.

  1. Pareto Chart
  2. PDPC
  3. Arrow Diagram
  4. Matrix Diagram
Correct Answer

Q8. When the mean of the process is outside the customer specification limits the value of Cpk will be:

  1. 2.0
  2. 0.5
  3. 1.0
  4. Negative
Correct Answer

Q9. The major purpose of the Control Phase in DMAIC is to:

  1. Identify root causes
  2. Determine long term solutions
  3. Maintain the gains made with implemented solutions
  4. Calculate Cp and Cpk
Correct Answer

Q10. Quality management deals with all of the following topics except:

  1. Conformance to requirements / specifications
  2. Satisfying the needs of the customer
  3. Making products more desirable and luxurious
  4. A and C
  5. B and C
Correct Answer










User Agreement| |Privacy Policy