IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

The major purpose of the Control Phase in DMAIC is to:
  1. Identify root causes
  2. Determine long term solutions
  3. Maintain the gains made with implemented solutions
  4. Calculate Cp and Cpk






Q2. ______________ is the set of activities that ensures the quality levels of products and services are properly maintained and that supplier and customer quality issues are properly resolved.

  1. Quality Control
  2. Quality Management
  3. Quality Assurance
  4. Quality Planning
Correct Answer

Q3. Taguchi suggested that loss in a process is'increased with increase in which of the following?

  1. Specifications
  2. Standards
  3. Competition
  4. Variability
Correct Answer

Q4. ______________ can be defined as small subset of a lot.

  1. Defect
  2. Fraction Acceptable
  3. Sample
  4. Acceptance Number
Correct Answer

Q5. Which of the following statements about the cost of quality are true?

  1. The costs of quality are mostly the direct responsibility of workers who are manufacturing the product
  2. Quality control programs should only be implemented when the costs of quality is low
  3. A and B
  4. A and C
  5. The cost of quality is the expense of nonconformance to requirements and specifications
Correct Answer

Q6. In a quality management information system, there is a need to collect data and format such data into an information output that is useful to the project manager. In developing such an information system, it is good to remember that an optimum system does not supply all the information because ______________.

  1. some information costs more to collect than it is worth
  2. some information is not available for collection and input
  3. most information relies on related data to generate the proper output
  4. there is never enough information collected
  5. the system is incapable of processing all the required information
Correct Answer

Q7. Random variance in a process, as measured by the standard deviation, can be directly reduced by:

  1. identifying patterns of variance using control charts
  2. improving the overall system of production
  3. increasing the number of quality inspectors
  4. making use of run charts
  5. making better use of Pareto charts
Correct Answer

Q8. In computing the cost of producing a quality product, the major areas of costs contribute to the sale price of the product. The ratio of the ______________ costs determine whether an effective program is fully implemented.

  1. direct, indirect, and overhead
  2. one-time, recurring, and variable
  3. variable, fixed, and semi-fixed
  4. prevention, appraisal, and failure
  5. build, repair, and test
Correct Answer

Q9. A series of consecutive points on the same side of the average is called:

  1. Run
  2. Trend
  3. Outliers
  4. Cycle
Correct Answer

Q10. From a high level perspective, quality:

  1. is ensured by having inspectors
  2. problems are usually caused by unmotivated employees
  3. cannot be quantitatively measured
  4. and productivity are inconsistent objectives
  5. is primarily (85 - 95%) a management problem
Correct Answer










User Agreement| |Privacy Policy