IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

The concept that it is easier and less costly to do the work right the first time is called:
  1. Zero defects
  2. Continuous improvement
  3. DTRTRTFT
  4. The customer is the next person in the process






Q2. Which of the following is the correct combination of specifications while designing a control chart:

  1. Sample size, Frequency of sampling, specification limit
  2. Sample size, Frequency of sampling, Number of defects
  3. Sample size, Specification limit, process standard deviation
  4. Sample size, Process mean, specification limit
Correct Answer

Q3. Statistical Process Control uses diagrams called "Control Charts." These charts depict horizontal, parallel lines to represent ______________ standard deviations.

  1. six
  2. five
  3. four
  4. three
  5. two
Correct Answer

Q4. ______________ refers to general processes of improvement and encompasses discontinuous improvements

  1. Continuous improvement
  2. Continual improvement
  3. Constant improvement
  4. Consecutive improvement
Correct Answer

Q5. Lot tolerance percent defective (LTPD) is a level of lot quality specified by the ______________.

  1. Consumer
  2. Producer
  3. Supplier
  4. Sampling Plan
Correct Answer

Q6. At the time of making a purchase agreement with a vendor, what is important to mention about inspection?

  1. the characteristics of the product that are to be inspected
  2. the tolerances that would be allowed
  3. the reputation of the vendor
  4. a & b both (not sure)
Correct Answer

Q7. A simple experimental design with two levels of an independent variable cannot

  1. detect a curvilinear relationship between variables.
  2. detect a monotonic relationship.
  3. reveal a positive relationship.
  4. show a negative relationship outcome.
Correct Answer

Q8. Which set-up operation under SMED involves machine to stop for performing the operation

  1. internal
  2. External
  3. Functional clamps
  4. Intermediate jigs
Correct Answer

Q9. A result is called "statistically significant" whenever

  1. The null hypothesis is true.
  2. The alternative hypothesis is true.
  3. The p-value is less or equal to the significance level.
  4. The p-value is larger than the significance level.
Correct Answer

Q10. Juran's quality management philosophy is based on three pillars namely planning, control and ______________.

  1. Implementation
  2. Improvement
  3. Monitor
  4. Design
Correct Answer










User Agreement| |Privacy Policy