IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Quality - Question 1:

Which of the following is the correct combination of specifications while designing a control chart:

  1. Sample size, Frequency of sampling, specification limit
  2. Sample size, Frequency of sampling, Number of defects
  3. Sample size, Specification limit, process standard deviation
  4. Sample size, Process mean, specification limit






Quality- Q2. The four phases of the Shewart cycle are:

  1. Plan, Do, Scan, Implement
  2. Plan , Act , Do, Control
  3. Plan, Do, Check, Act
  4. Implement, Design, Control, Plan
Correct Answer


Quality- Q3. Quality Trilogy includes

  1. Quality planning
  2. quality improvement
  3. quality control
  4. All the three
Correct Answer


Quality- Q4. A deliverable of the Improve phase is to

  1. Determine project goals
  2. Identify and validate root causes
  3. Develop a plan for controlling the implemented solutions
  4. None of the above
Correct Answer


Quality- Q5. The ability of a product to be used for different purposes at different capacities and under different conditions determines its:

  1. Availability
  2. Usability
  3. Flexibility
  4. Operability
Correct Answer


Quality- Q6. Pattern in control charts which show the tendency to cluster around central line is termed as:

  1. Stratification
  2. Mixture
  3. Cyclic pattern
  4. Shift in process level
Correct Answer


Quality- Q7. elements of quality management system are ______________

  1. organizational structure
  2. responsibilities
  3. procedures
  4. all the three
Correct Answer


Quality- Q8. Statistical Process Control is used in quality programs to determine whether repetitive operations meet predictable standards. The process uses ______________ to permit accurate monitoring of the operation.

  1. 100 percent inspection and random rejection
  2. acceptance sampling and automatic rejection
  3. continuous sampling and error detection methods
  4. random sampling and corrective procedures
  5. statistical sampling and control procedures
Correct Answer


Quality- Q9. The error deviations within the residual sum of squares (SSE) statistic measure distances:

  1. within groups
  2. between groups
  3. between each value and the grand mean
  4. none of these
Correct Answer


Quality- Q10. Consider that for a particular process, the p has shifted to .4 and the process has gone out of control. The corresponding value of beta is found to be .3356. The value of Average Run Length is:

  1. 2.5
  2. 1.5 ((1/1-beta) provides us with average run length)
  3. 1.0
  4. 2.7
Correct Answer











User Agreement| |Privacy Policy
© 2026 - Tag&Link – Mostafa Taha Mohamed