Quality - Question 1:

Pattern in control charts which show the tendency to cluster around central line is termed as:

  1. Stratification
  2. Mixture
  3. Cyclic pattern
  4. Shift in process level






Quality- Q2. If the Average outgoing Quality is plotted against the Incoming Fraction Defective, the Average Outgoing Quality Limit is the ______________ point.

  1. Highest
  2. Lowest
  3. Middle
  4. Cannot be determined
Correct Answer


Quality- Q3. Identify the cost not likely to reduce as a result of better quality.

  1. Maintenance costs
  2. Inspection costs
  3. Scrap costs
  4. Warranty and service costs
Correct Answer


Quality- Q4. A fishbone diagram is also known as a .______________

  1. cause-and-effect diagram
  2. poka-yoke diagram
  3. Kaizen diagram
  4. Taguchi diagram
Correct Answer


Quality- Q5. The major purpose of the Control Phase in DMAIC is to:

  1. Identify root causes
  2. Determine long term solutions
  3. Maintain the gains made with implemented solutions
  4. Calculate Cp and Cpk
Correct Answer


Quality- Q6. Consider for a process in control, the value of alpha is .0015. What is the value of the average run length?

  1. 666 ( 1/alpha gives us an estimate of average run length)
  2. 555
  3. 444
  4. None of the above
Correct Answer


Quality- Q7. A planning method designed to show the tasks associated with a project, the personnel responsible for completing the tasks and the timelines allowed

  1. Pareto chart
  2. Gantt chart
  3. Microsoft Project
  4. Check sheet
Correct Answer


Quality- Q8. Juran's Quality trilogy emphasizes the roles of quality planning, quality control and ______________

  1. Quality Definition
  2. Quality enhancement
  3. Quality improvement
  4. quality maintenance
Correct Answer


Quality- Q9. Mistake proofing of process is done in the ______________ stage of DMAIC.

  1. Define
  2. Measure
  3. Improve
  4. Control
Correct Answer


Quality- Q10. For a c chart, the OC curve plots the ______________ against ______________.

  1. Probability of Type 2 error, true mean number of defects
  2. Probability of Type 1 error, true mean number of defects
  3. Probability of Type 1 error, true total number of defects
  4. Probability of Type 2 error, true total number of defects
Correct Answer