Quality - Question 1:

Consider for a process in control, the value of alpha is .0015. What is the value of the average run length?

  1. 666 ( 1/alpha gives us an estimate of average run length)
  2. 555
  3. 444
  4. None of the above






Quality- Q2. The ______________ diagram starts with one item which then branches of into two or more items. This diagram is used to breakdown broad categories into finer levels of detail.

  1. Affinity
  2. Tree
  3. Relations
  4. Matrix
Correct Answer


Quality- Q3. The pillars of quality is (are)

  1. B and C
  2. Quality is free
  3. Doing it right the first time
  4. Zero defects
  5. Process improvement
Correct Answer


Quality- Q4. An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart?

  1. When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
  2. When the number of samples outside the current control chart limits become too costly and cumbersome to investigate
  3. When a process is subject to constant but stable tool wear
  4. A and B
  5. A and C
Correct Answer


Quality- Q5. Quality control includes inspections to ensure the standards of performance are being met. Inspection includes ______________ examinations of ______________.

  1. visual and technical; material and end products
  2. aural and tactile; materials and end products
  3. aural and tactile; processes and procedures
  4. visual and non-visual; processes and components
  5. visual and aural; processes and materials
Correct Answer


Quality- Q6. Deming's 4 step cycle for improvement is______________

  1. plan, do, check, act
  2. schedule, do, act, check
  3. do, act, check, monitor
  4. plan, control, act, sustain
Correct Answer


Quality- Q7. Factory A produces 100 pieces of wooden legs used in manufacturing tables in 1 hour. The factory in total works for 3 hours. The quality manager decided to check the quality of the output by measuring the length of the legs (in cms). He decides to collect three samples (one for each hour). The sample size for each sample is fixed at 5. The data collected is present in the following table: Leg 1 Leg 2 Leg 3 Leg 4 Leg 5 Sample 1 10.2 10.5 9.8 9.7 10.3 Sample 2 10.4 9.9 10.1 10.2 9.8 Sample 3 9.9 9.8 10.2 10.1 10.4 What is the mean and range of leg length in sample 1?

  1. Mean=10.3;Range=.3
  2. Mean=10.1;Range=.8
  3. Mean=10.2;Range=.6
  4. Mean=9.9;Range=.5
Correct Answer


Quality- Q8. A Belt utilized a diamond symbol in a Process Map she created for the process that was subject to her LSS project. By use of the diamond symbol she was showing a(n) _______________ point in the process

  1. Ending
  2. Beginning
  3. Decision
  4. Repair station
Correct Answer


Quality- Q9. Which of the following is not a type of attribute chart?

  1. P chart
  2. C chart
  3. U char
  4. X bar chart
Correct Answer


Quality- Q10. For a given sample size (n) and number of defects acceptable ©, the Average Total Inspection (of units) should ______________ with increase in N (lot size).

  1. Increase
  2. Decrease
  3. Remain Constant
  4. None of the above
Correct Answer