Question:

Mistake proofing of process is done in the ______________ stage of DMAIC.
  1. Define
  2. Measure
  3. Improve
  4. Control






Q2. reliability is the degree to which a unit of equipment performs its intended function under ______________ for ______________ of time.

  1. specified conditions; specified period
  2. any condition; specified period
  3. specified conditions; all periods
  4. any condition; any period
Correct Answer

Q3. Quality Circles members are ______________

  1. Paid according to their contribution to quality
  2. External consultants designed to provide training in the use of Quality tools
  3. Always machine operators
  4. None of the three.
Correct Answer

Q4. Assured quality is necessary for building customer confidence.

  1. correct
  2. correct to some extent
  3. correct to great extent
  4. incorrect
Correct Answer

Q5. What is the benefit of an organisation adopting a quality management system?

  1. Facilities opportunities to enhance customer satisfaction
  2. All of the above
  3. Addresses risks and opportunities to enhance customer satisfaction
  4. Improves the organisations overall performance and provides a sound basis for sustainable development initiatives
Correct Answer

Q6. Measurement accuracy is attained when...

  1. Different people get the same result when measuring the same item or characteristic.
  2. The same person taking multiple measurements on the same item or characteristic gets the same results every time.
  3. The measured value has little deviation from the actual value.
  4. When the resolution of the measurement instrument can give at least 5 distinct values in the range being measured.
Correct Answer

Q7. During experimental design, a variable is defined as:

  1. Treatment
  2. Factor
  3. Variance
  4. None of these
Correct Answer

Q8. The roof of house of quality shows the interrelationship between:

  1. Functional Requirements
  2. Design Attributes
  3. Service Process
  4. Manufacturing Process
Correct Answer

Q9. Which VSM icon is placed under other icons and have information required for system analysis like process time, lead time, etc?

  1. Data Table
  2. Information Box
  3. Manual Information
  4. Electronic Information
Correct Answer

Q10. A two-tailed test is one where:

  1. results in only one direction can lead to rejection of the null hypothesis
  2. negative sample means lead to rejection of the null hypothesis
  3. results in either of two directions can lead to rejection of the null hypothesis
  4. no results lead to the rejection of the null hypothesis
Correct Answer










User Agreement| |Privacy Policy