IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

You are sampling items from a batch and plotting the results on a control chart. how will an increase in the number of items sample affect the value of the standard deviation used to set the control limit?
  1. increase it
  2. decrease it
  3. no effect on it
  4. first increase it, then decrease it
  5. first decrease it, then increase it






Q2. Crosby’s approach to management is:

  1. A problem that can never be solved
  2. Absolutes of Quality Management
  3. Interim Management
  4. ISO
Correct Answer

Q3. Which VSM icon is placed under other icons and have information required for system analysis like process time, lead time, etc?

  1. Data Table
  2. Information Box
  3. Manual Information
  4. Electronic Information
Correct Answer

Q4. ______________ refers to general processes of improvement and encompasses discontinuous improvements

  1. Continuous improvement
  2. Continual improvement
  3. Constant improvement
  4. Consecutive improvement
Correct Answer

Q5. What does the lean manufacturing aims to?

  1. Outsource much of our manufacturing in order to focus on final assembly
  2. Produce goods using less resources compared to mass production techniques
  3. Produce products with fewer options to simplify consumer choices
  4. Keep labor costs as low as possible by using more of other resources
Correct Answer

Q6. When the number of defects is low, which of the following is true:

  1. We should use c or u chart
  2. Most samples will have non-zero defects
  3. Create a time between occurrence control chart
  4. None of the above
Correct Answer

Q7. The roof of house of quality shows the interrelationship between:

  1. Functional Requirements
  2. Design Attributes
  3. Service Process
  4. Manufacturing Process
Correct Answer

Q8. Plan-do-study-act cycle is a procedure to ______________

  1. Overall improvement
  2. Continuous improvement
  3. Permanent improvement
  4. Immediate improvement
Correct Answer

Q9. Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below ______________ defects per million opportunities (DPMO).

  1. 2
  2. 2.4
  3. 3
  4. 3.4
Correct Answer

Q10. Apart from Poisson distribution, another distribution that can be applied to events data is:

  1. Normal Distribution
  2. Geometric Distribution
  3. Lognormal Distribution
  4. Continuous Distribution
Correct Answer










User Agreement| |Privacy Policy