Quality - Question 1:

Example of prevention costs is:

  1. Quality improvement projects
  2. Downgrading
  3. To link outcomes to uses
  4. Warranty claims






Quality- Q2. The main purpose of a stratification plan is:

  1. To prove statistical validity
  2. Define categories to slice and dice the data
  3. Determine which statistical tool to use
  4. To identify solutions
Correct Answer


Quality- Q3. All of the following statements about control charts are true except:

  1. All data points outside the control chart limits are variations explained by
  2. Control charts can be used to establish as well as maintain process control
  3. A and B
  4. B and C
  5. Control charts are used to determine acceptance limits when no limits are stipulated by the product specification; otherwise, one should use the limits dictated by the specification
Correct Answer


Quality- Q4. A fan blade is specified by length and thickness. While sampling, it was found that for one particular blade, the length was non-conforming while the thickness was as per specifications. Should the blade be considered non-conforming for construction of a p chart?

  1. Yes
  2. No
Correct Answer


Quality- Q5. wich of the following is not considered a cost of nonconformance to quality?

  1. Scrap
  2. Rework
  3. Expediting
  4. Process control
  5. all of the above are considered nonconformance costs
Correct Answer


Quality- Q6. The probability distribution function corresponding to tossing of a coin will be a:

  1. Probability Density function
  2. Probability Mass function
  3. Probability Measurement function
  4. Probability Cumulative Function
Correct Answer


Quality- Q7. Lot tolerance percent defective (LTPD) is a level of lot quality specified by the ______________.

  1. Consumer
  2. Producer
  3. Supplier
  4. Sampling Plan
Correct Answer


Quality- Q8. In ______________ step of Quality Function Deployment, product or service requirements are collected and analysed through techniques like market research.

  1. Identify Customer Attributes
  2. Identify Design Attributes / Requirements
  3. Conduct an Evaluation of Competing Products.
  4. Evaluate Design Attributes and Develop Targets
Correct Answer


Quality- Q9. The pillars of quality is (are)

  1. B and C
  2. Quality is free
  3. Doing it right the first time
  4. Zero defects
  5. Process improvement
Correct Answer


Quality- Q10. The roof of house of quality shows the interrelationship between:

  1. Functional Requirements
  2. Design Attributes
  3. Service Process
  4. Manufacturing Process
Correct Answer