In order to achieve long-term quality improvements, management must do the following:
  1. Implement a formal quality control program with worker and management involvement
  2. Establish financial incentive packages for workers
  3. A and D
  4. Motivate the employees with seminars, contests, and institution of programs such as "Quality Improvement" day
  5. Create a quality control department and give the head of the department ultimate responsibility for quality improvement






Q2. Lots for acceptance sampling should be ______________ and ______________.

  1. Homogeneous, Large
  2. Heterogeneous, Small
  3. Homogeneous, Small
  4. Heterogeneous, Large
Correct Answer

Q3. The probability distribution function corresponding to tossing of a coin will be a:

  1. Probability Density function
  2. Probability Mass function
  3. Probability Measurement function
  4. Probability Cumulative Function
Correct Answer

Q4. The concept of zero inventory is called:

  1. Six sigma
  2. Continuous improvement
  3. Just in Time
  4. Zero defects
Correct Answer

Q5. Self-inspection by the individual performing the work is used to achieve quality in a product. The advantages of self-inspection include ______________.

  1. minimization of end product repairs and material waste
  2. immediate feedback to permit adjustments to the process
  3. early identification of errors prior to further integration
  4. reduction in the number of end product inspections and tests
  5. all of the above
Correct Answer

Q6. Pattern in control charts which show the tendency to cluster around central line is termed as:

  1. Stratification
  2. Mixture
  3. Cyclic pattern
  4. Shift in process level
Correct Answer

Q7. If only ______________ causes of variation are present, the output of a process forms a distribution that is table over time and is predictable.

  1. Assignable
  2. Non-Random
  3. Natural
  4. Cannot be said
Correct Answer

Q8. Current quality concept is i. Increase in production ii. Continual improvement iii. Prevention of defect The correct order is

  1. i & ii
  2. i & iii
  3. ii & iii
  4. None of the above
Correct Answer

Q9. Statistical Process Control uses diagrams called "Control Charts." These charts depict horizontal, parallel lines to represent ______________ standard deviations.

  1. six
  2. five
  3. four
  4. three
  5. two
Correct Answer

Q10. One of the most common measures of variability in a data set or population

  1. Process capability
  2. Specification limits
  3. Mean
  4. Standard Deviation
Correct Answer