IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

If data for MR chat shows non-normality, it is better to determine the control limits for the individuals control chart based on the ______________ of the correct underlying distribution.
  1. Percentage
  2. Percentiles
  3. Rank
  4. Mean






Q2. The x bar chart monitors:

  1. Between sample variability
  2. Within sample variability
  3. Instantaneous variability
  4. Natural variability
Correct Answer

Q3. establishing measurements based on customer needs for optimizing product design is known as ______________

  1. Quality design
  2. quality improvement
  3. quality control
  4. Quality planning
Correct Answer

Q4. The Operating characteristic curve shows the relationship between the probability of acceptance (on y axis) and ______________ (on x axis).

  1. Proportion defective
  2. Proportion acceptable
  3. Number of lots
  4. Size of lot
Correct Answer

Q5. The defect concentration diagram can be used in the ______________ stage of the DMAIC.

  1. Define
  2. Measure
  3. Analyze
  4. Improve
Correct Answer

Q6. In a six sigma improvement project the least experienced individuals are:

  1. Red Belts
  2. Master Black Belts
  3. Green Belt
  4. Black belts
Correct Answer

Q7. ______________ refers to general processes of improvement and encompasses discontinuous improvements

  1. Continuous improvement
  2. Continual improvement
  3. Constant improvement
  4. Consecutive improvement
Correct Answer

Q8. They set very clear scope for all Six Sigma projects. They are responsible for approving any changes to the scope of the project

  1. Six Sigma Deployment Leader
  2. Champion (Sponsor)
  3. Master Black Belt
  4. Black Belt
Correct Answer

Q9. Which is not a commonly used quality management tool?

  1. Fishbone diagram
  2. CSSR report
  3. Pareto chart
  4. Control chart
  5. None of the above (all are commonly used)
Correct Answer

Q10. QFD stands for ______________

  1. Quantity for deployment
  2. Quality for deployment
  3. Quality function deployment
  4. Quality for decision
Correct Answer










User Agreement| |Privacy Policy