IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

They set very clear scope for all Six Sigma projects. They are responsible for approving any changes to the scope of the project
  1. Six Sigma Deployment Leader
  2. Champion (Sponsor)
  3. Master Black Belt
  4. Black Belt






Q2. A company wants to measure the length of a fan as a part of its quality control exercise. The type of data collected will be:

  1. Variable
  2. Attribute
  3. Cannot be determined
  4. None of the above
Correct Answer

Q3. What does takt time measures?

  1. The rate of customer demand
  2. The product completion time
  3. The rate of customer demand
  4. The process completion time
Correct Answer

Q4. The x bar chart monitors:

  1. Between sample variability
  2. Within sample variability
  3. Instantaneous variability
  4. Natural variability
Correct Answer

Q5. A leadership style that is said to motivate employees, and that optimizes the introduction of change is:

  1. Autocratic – A clear top-down approach where a single individual has complete power of decision-making and little discussion is had for external input.
  2. Consultative – A style where leaders engage subordinates/peers in the decision-making and problem-solving process, but ultimately make the final decisions for the team.
  3. Participatory – An approach where leaders interact with other participants as peers, engaging them in the decision-making process and playing an equal role in the process as others and jointly carrying out the problem solving activities.
  4. Democratic – An open style of running a team where leaders facilitate discussion among all members, encourage ideas to be shared, and consider everyone’s input in order to make final decisions for the team.
Correct Answer

Q6. Which VSM icon is placed under other icons and have information required for system analysis like process time, lead time, etc?

  1. Data Table
  2. Information Box
  3. Manual Information
  4. Electronic Information
Correct Answer

Q7. Which one of the following depicts feature, which is a dimension of quality?

  1. Ability to repair a product
  2. Product looks and sounds
  3. Brand name and price
  4. Bells and whistles of the product
Correct Answer

Q8. Which of the following is the correct combination of specifications while designing a control chart:

  1. Sample size, Frequency of sampling, specification limit
  2. Sample size, Frequency of sampling, Number of defects
  3. Sample size, Specification limit, process standard deviation
  4. Sample size, Process mean, specification limit
Correct Answer

Q9. X bar should never be interpreted when:

  1. R chart shows out of control points
  2. X bar chart shows out of control points
  3. The process mean is not known
  4. None of the above
Correct Answer

Q10. How does ISO 9000:2015 define a process?

  1. Set of interrelated or interacting activities which uses inputs to deliver a result that meets or exceeds the ISO 9001 standards of quality
  2. A full lifecycle of events which includes inputs such as materials and information, management, resources and outputs
  3. A cycle which includes inputs, actions and outputs to ensure quality is met
  4. Set of interrelated or interacting activities that uses inputs to deliver an intended result
Correct Answer










User Agreement| |Privacy Policy