IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Quality - Question 1:

In a six sigma improvement project the least experienced individuals are:

  1. Red Belts
  2. Master Black Belts
  3. Green Belt
  4. Black belts






Quality- Q2. Consider that for a process s bar (average standard deviation of 50 samples each of size 4) is found to be 10.04. The value of c4 (corresponding to sample size of .4) is .92. What is the estimated value of process standard deviation?

  1. 10.91 (s bar/ c4 is an unbiased estimator of standard deviation)
  2. 11.89
  3. 12.67
  4. 9.67
Correct Answer


Quality- Q3. A researcher conducted a 2 x 2 completely repeated measures factorial design and planned 15 participants in each condition. How many participants would be required to conduct this experiment?

  1. 15
  2. 30
  3. 45
  4. 60
Correct Answer


Quality- Q4. Inspection, scrap, and repair are examples of ______________

  1. internal costs
  2. external costs
  3. costs of dissatisfaction
  4. societal costs
Correct Answer


Quality- Q5. Inspection of incoming/outgoing items is an example of ______________.

  1. Prevention Cost
  2. Appraisal Cost
  3. Internal Failure Cost
  4. External Failure Cost
Correct Answer


Quality- Q6. What does the transcendent view imply for high quality?

  1. It is something everlasting
  2. It is something timeless and enduring
  3. It is something priceless
  4. It is something perfect
Correct Answer


Quality- Q7. Plan-do-study-act cycle is a procedure to ______________

  1. Overall improvement
  2. Continuous improvement
  3. Permanent improvement
  4. Immediate improvement
Correct Answer


Quality- Q8. A ______________ chart can be used to identify the most frequently occurring defect.

  1. Pareto
  2. Ishikawa
  3. Histogram
  4. Scatter
Correct Answer


Quality- Q9. What is not part of set up reduction?

  1. Keeping tools and gages in kits
  2. Adding adjustments to fixtures and tools
  3. Mistake proofing setup activities
  4. Defining internal and external tasks
Correct Answer


Quality- Q10. For a double sampling plan the probability of acceptance on the combined samples is calculated as:

  1. Maximum of probability of acceptance of first and second sample
  2. Product of probability of acceptance of first and second sample
  3. Average of probability of acceptance of first and second sample
  4. Sum of probability of acceptance of first and second sample
Correct Answer











User Agreement| |Privacy Policy
© 2026 - Tag&Link – Mostafa Taha Mohamed