IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

Inspection of incoming/outgoing items is an example of ______________.
  1. Prevention Cost
  2. Appraisal Cost
  3. Internal Failure Cost
  4. External Failure Cost






Q2. Which of the following is the correct combination of specifications while designing a control chart?

  1. Sample size, Process mean, specification limit
  2. Sample size, Frequency of sampling, specification limit
  3. Sample size, Frequency of sampling, Number of defects
  4. Sample size, Specification limit, process standard deviation
Correct Answer

Q3. A deliverable of the Improve phase is to:

  1. Determine project goals
  2. Identify and validate root causes
  3. Develop a plan for controlling the implemented solutions
  4. None of the above
Correct Answer

Q4. Consider for a process in control, the value of alpha is .0015. What is the value of the average run length?

  1. 666 ( 1/alpha gives us an estimate of average run length)
  2. 555
  3. 444
  4. None of the above
Correct Answer

Q5. establishing measurements based on customer needs for optimizing product design is known as ______________

  1. Quality design
  2. quality improvement
  3. quality control
  4. Quality planning
Correct Answer

Q6. In a factorial design, a main effect is the ______________.

  1. the combined effect of the independent variables on the dependent variable
  2. interaction effect of the independent variables and their effect on the dependent
  3. the effect of each independent variable on the dependent variable
  4. interaction of the independent variables
Correct Answer

Q7. While the first generation of Six sigma focused on ______________, the third generation of six sigma focused on ______________.

  1. Variability reduction, creating value
  2. Variability reduction, improved business performance
  3. Creating value, Improved business performance
  4. None of the above
Correct Answer

Q8. Quality practices must be carried out ______________

  1. at the start of the project
  2. throuout the life of the project
  3. at the end of the project
  4. no neeed to carry out quality practices
Correct Answer

Q9. From a consumer perspective quality is determined by ______________ while from a producers perspective quality is determined by ______________.

  1. Variability, Cost
  2. Cost, Price
  3. Price, Cost
  4. Cost, Variability
Correct Answer

Q10. What does the transcendent view imply for high quality?

  1. It is something everlasting
  2. It is something timeless and enduring
  3. It is something priceless
  4. It is something perfect
Correct Answer










User Agreement| |Privacy Policy