Quality - Question 1:

What is not part of set up reduction?

  1. Keeping tools and gages in kits
  2. Adding adjustments to fixtures and tools
  3. Mistake proofing setup activities
  4. Defining internal and external tasks






Quality- Q2. establishing measurements based on customer needs for optimizing product design is known as ______________

  1. Quality design
  2. quality improvement
  3. quality control
  4. Quality planning
Correct Answer


Quality- Q3. In phase 1 of control chart usage, if a point is outside the control limits and some assignable cause is found for the point, then we should:

  1. Discard the point but do not recalculate control limits
  2. Discard the point and recalculate the control limit
  3. Do not discard the point
  4. Cannot be determined
Correct Answer


Quality- Q4. The first step in problem solving is to:

  1. Assume the worst.
  2. Establish responsibility for change.
  3. Collect and analyze data.
  4. Define the problem issue.
Correct Answer


Quality- Q5. A sample of size 10 contains 50 non-conformities. The average number of non-conformities is:

  1. 7
  2. 4
  3. 5 (50/10 i.e. total non-conformities/sample size)
  4. 1
Correct Answer


Quality- Q6. Costs of dissatisfaction, repair costs, and warranty costs are elements of cost in the ______________

  1. Taguchi Loss Function
  2. Pareto Chart
  3. ISO 9000 Quality Cost Calculator
  4. Process Chart
Correct Answer


Quality- Q7. An improvement process in which a company measures its performance against that of best-in-class companies, determines how those companies achieved their performance levels, and uses the information to improve its own performance

  1. Control Chart
  2. Six Sigma
  3. Cause and Effect Diagram
  4. Benchmarking
Correct Answer


Quality- Q8. Producers risk can be defined as:

  1. The probability of rejecting a good lot
  2. The probability of accepting a bad lot
  3. The probability of accepting a good lot
  4. The probability of rejecting a bad lot
Correct Answer


Quality- Q9. Quality circles work best if employees are initially trained in ______________

  1. Group dynamics
  2. Motivation principles
  3. Communications
  4. All of the three.
Correct Answer


Quality- Q10. If data for MR chat shows non-normality, it is better to determine the control limits for the individuals control chart based on the ______________ of the correct underlying distribution.

  1. Percentage
  2. Percentiles
  3. Rank
  4. Mean
Correct Answer