IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

Quality control is:
  1. evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards
  2. taking action to increase the effectiveness and efficiency of the project so as to provide added benefits to both the performing organization and the project customer
  3. assuming the production of goods that meet the highest standards of luxury
  4. identifying which quality standards are relevant to the project and determining how to satisfy them
  5. monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance






Q2. The concept of zero inventory is called:

  1. Six sigma
  2. Continuous improvement
  3. Just in Time
  4. Zero defects
Correct Answer

Q3. Deming's 4 step cycle for improvement is______________

  1. plan, do, check, act
  2. schedule, do, act, check
  3. do, act, check, monitor
  4. plan, control, act, sustain
Correct Answer

Q4. While random variability in a system can be removed by ______________, non-random variability requires ______________.

  1. Operator or management action, Improvement in the system
  2. Improvement in the system, operator or management action
  3. Statistical Quality Control, Quality Checks
  4. None of the above
Correct Answer

Q5. A sample of size 10 contains 50 non-conformities. The average number of non-conformities is:

  1. 7
  2. 4
  3. 5 (50/10 i.e. total non-conformities/sample size)
  4. 1
Correct Answer

Q6. CMM stands for

  1. Capability maturity model
  2. Capability monitoring model
  3. Capability measuring model
  4. Capability matching model
Correct Answer

Q7. The x bar chart monitors:

  1. Between sample variability
  2. Within sample variability
  3. Instantaneous variability
  4. Natural variability
Correct Answer

Q8. Which of the following is least likely to contribute to developing an effective project team supportive of quality?

  1. Commitment to the project
  2. Team member flexibility
  3. Frequent turnover of personnel
  4. Team interest in workmanship
  5. Clearly defined goals
Correct Answer

Q9. Assured quality is necessary for building customer confidence.

  1. correct
  2. correct to some extent
  3. correct to great extent
  4. incorrect
Correct Answer

Q10. For a process which is six sigma complaint, the percentage of products within specifications is:

  1. 95.20%
  2. 99.73%
  3. 99.10%
  4. 96.78%
Correct Answer










User Agreement| |Privacy Policy