Question:

While setting Goal, following things to be consider. i. Customer need ii. Marketability of product iii. Organization need The correct order is
  1. i only
  2. i & ii
  3. ii & iii
  4. i, ii & iii






Q2. Quality control is the technical processes that ______________ the project's progress against the performance standards.

  1. examine, analyze, and report
  2. inspect, certify, and verify
  3. inspect, examine, and determine
  4. identify, measure, and report
  5. reveal, establish, and record
Correct Answer

Q3. ______________ refers to general processes of improvement and encompasses discontinuous improvements

  1. Continuous improvement
  2. Continual improvement
  3. Constant improvement
  4. Consecutive improvement
Correct Answer

Q4. A main role of the project Champion is to:

  1. Be a cheerleader for the team
  2. Remove roadblocks
  3. Perform statistical analysis
  4. Develop the control plan
Correct Answer

Q5. If variability of a product decreases, its quality ______________

  1. remains unchanged
  2. decreases
  3. increases
  4. may increase or decrease
Correct Answer

Q6. At the time of making a purchase agreement with a vendor, what is important to mention about inspection?

  1. the characteristics of the product that are to be inspected
  2. the tolerances that would be allowed
  3. the reputation of the vendor
  4. a & b both (not sure)
Correct Answer

Q7. Lot tolerance percent defective (LTPD) is a level of lot quality specified by the ______________.

  1. Consumer
  2. Producer
  3. Supplier
  4. Sampling Plan
Correct Answer

Q8. From the project manager's viewpoint, quality assurance involves:

  1. conducting studies to determine if design methods will support quality requirements
  2. A, B, and C
  3. identifying applicable laws, ordinances and regulations that the project must comply with
  4. monitoring inspection activities to ensure that the work is performed as specified
  5. A and C
Correct Answer

Q9. Consider that for a process s bar (average standard deviation of 50 samples each of size 4) is found to be 10.04. The value of c4 (corresponding to sample size of .4) is .92. What is the estimated value of process standard deviation?

  1. 10.91 (s bar/ c4 is an unbiased estimator of standard deviation)
  2. 11.89
  3. 12.67
  4. 9.67
Correct Answer

Q10. The concept of rational sub group means that subgroups or samples be selected such that if assignable causes are present the chances for differences between subgroups will be ______________.

  1. minimized
  2. maximized
  3. neutralized
  4. optimized
Correct Answer