Quality Question Bank
for Exam preparation

Select Knowledge area

Quality - Question 1:

For new product development, the chosen methodology should be

  1. DMADV
  2. DMAIC
  3. Structured Design Methodology
  4. DMIE






Quality- Q2. Q-Q plot is used to check:

  1. Normality of the dataset
  2. Number of defects
  3. Process mean
  4. Process standard deviation
Correct Answer


Quality- Q3. The middle value of a data set when the values are arranged in either ascending or descending order

  1. Median
  2. Mode
  3. Mean
  4. Discrete Data
Correct Answer


Quality- Q4. Which type of OEE category does component jam is classified into?

  1. Quality loss
  2. Downtime loss
  3. Speed Loss
  4. Depends upon the duration of component jam
Correct Answer


Quality- Q5. Given L=3 and p=.03, estimate the sample size that can be used for construction of a p chart.

  1. 534
  2. 321
  3. 123
  4. 291 ((1-p)*L2/p gives us an estimate of sample size)
Correct Answer


Quality- Q6. A major assumption for p chart is that all units produced are ______________.

  1. Independent
  2. Dependent
  3. None of the above
  4. Cannot be determined
Correct Answer


Quality- Q7. ______________ is not a process tools for TQM systems

  1. process flow analysis
  2. histograms
  3. plier
  4. control charts
Correct Answer


Quality- Q8. Quality management is defined as the process of ensuring that a project meets the ______________ of the product's clients, participants, and shareholders.

  1. legal and financial obligations
  2. expectations and desires
  3. needs and expectations
  4. legal and moral requirements
  5. specifications and statements of work
Correct Answer


Quality- Q9. A researcher conducted a 2 x 2 completely repeated measures factorial design and planned 15 participants in each condition. How many participants would be required to conduct this experiment?

  1. 15
  2. 30
  3. 45
  4. 60
Correct Answer


Quality- Q10. Statistical Decision Making includes Pareto Analysis as a means of reducing errors in the total project process. Pareto Analysis ______________.

  1. compares the error rate with the pass rate to determine the allowable number of errors per 1,000
  2. compares the error rate of individuals to determine the compensation for bonuses
  3. is a method of rejecting errors or variances from standards following self-inspection
  4. is a procedure for ranking the errors to identify those contributing the most to failures [PMBOK p. B-2]
  5. counts errors or failures to determine the added cost of all operations that do not meet the requirements
Correct Answer