IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Quality - Question 1:

Which award is presented to different organizations for quality and excellent performance by president of USA?

  1. Malcolm Balbridge National Award
  2. Dr. W. Edward Deming National Award
  3. US Excellence Award
  4. None of the above






Quality- Q2. Bias reflects the:

  1. The differences in observed accuracy and/or precision experienced over the range of measurements made by the system.
  2. The difference between observed measurements and a "true" value obtained from a master or gold standard
  3. Different levels of variability in different operating regimes, resulting from warm-up effects, environmental factors, inconsistent operator performance
  4. None of the above
Correct Answer


Quality- Q3. The ______________ sum of squares measures the variability of the observed values around their respective treatment means.

  1. treatment
  2. error
  3. interaction
  4. total
Correct Answer


Quality- Q4. Which of the following statements is NOT true about charting variation?

  1. A mean and standard deviation will completely define a normal curve
  2. A histogram helps understand process performance
  3. A histogram is sufficient to chart variation
  4. Run charts display process performance over time
Correct Answer


Quality- Q5. Two factors are said to be orthogonal when:

  1. they are correlated, that is, they cannot vary independently
  2. there are equal numbers of participants in all groups
  3. they are uncorrelated, that is, they vary independently
  4. there is a single control group, with which all the other groups can be compared
Correct Answer


Quality- Q6. Quality control is:

  1. evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards
  2. taking action to increase the effectiveness and efficiency of the project so as to provide added benefits to both the performing organization and the project customer
  3. assuming the production of goods that meet the highest standards of luxury
  4. identifying which quality standards are relevant to the project and determining how to satisfy them
  5. monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance
Correct Answer


Quality- Q7. The x bar chart monitors:

  1. Between sample variability
  2. Within sample variability
  3. Instantaneous variability
  4. Natural variability
Correct Answer


Quality- Q8. The practice of ceasing mass inspections and ending awards based on price is credited to:

  1. Edward Deming
  2. Philip Crosby
  3. Juran
  4. Pareto
Correct Answer


Quality- Q9. Taguchi suggested that loss in a process is'increased with increase in which of the following?

  1. Specifications
  2. Standards
  3. Competition
  4. Variability
Correct Answer


Quality- Q10. Let there be a data set {200,201,202,203,204,205,206,207,208}. This data set can be represented using stem and leaf where the ______________ is 20 and the ______________ is {0,1,2,3,4,5,6,7,8}.

  1. Stem, Leaf
  2. Leaf, Stem
  3. Tree, Stem
  4. Tree, Leaf
Correct Answer











User Agreement| |Privacy Policy
© 2026 - Tag&Link – Mostafa Taha Mohamed