Quality - Question 1:

If a researcher planned to have 20 participants in each condition of a 2 x 3 independent groups factorial design, how many participants would be needed for this experiment?

  1. 40
  2. 60
  3. 80
  4. 120






Quality- Q2. Six Sigma is a business-driven, multi-dimensional structured approach to

  1. Reducing process variability
  2. Increasing customer satisfaction
  3. Lowering Defects
  4. Improving Processes
  5. All of the above
Correct Answer


Quality- Q3. If the Average outgoing Quality is plotted against the Incoming Fraction Defective, the Average Outgoing Quality Limit is the ______________ point.

  1. Highest
  2. Lowest
  3. Middle
  4. Cannot be determined
Correct Answer


Quality- Q4. The first step in problem solving is to:

  1. Assume the worst.
  2. Establish responsibility for change.
  3. Collect and analyze data.
  4. Define the problem issue.
Correct Answer


Quality- Q5. Suppose box A contains 4 red and 5 blue coins and box B contains 6 red and 3 blue coins. A coin is chosen at random from the box A and placed in box B. Finally, a coin is chosen at random from among those now in box B. What is the probability a blue coin was transferred from box A to box B given that the coin chosen from box B is red?

  1. 15/29
  2. 14/29
  3. 1/2
  4. 7/10
Correct Answer


Quality- Q6. What are the factors in a factorial design?

  1. the independent variables
  2. the dependent variables
  3. the organismic variables
  4. the experimental variables
Correct Answer


Quality- Q7. Small/Mid-sized Six Sigma projects are executed by professionals titled as:

  1. Champion
  2. Green Belt
  3. Black Belt
  4. Site Champion
Correct Answer


Quality- Q8. The project management team's for quality should:

  1. extend beyond the completion of the project
  2. stop at the point of delivery
  3. be significantly reduced by a good warranty
  4. be ignored by the project manager
  5. A and C
Correct Answer


Quality- Q9. Which waste is also called over-processing

  1. Non-value Processing
  2. Needless Inventory
  3. Overproduction
  4. Transport and Handling
Correct Answer


Quality- Q10. X bar charts are uses to control the ______________ of a process.

  1. Dispersion
  2. Central tendency
  3. None of the above
  4. Both a and b
Correct Answer