Question:

The majority of advertisers appeal the public on the basis of which of the following?
  1. Inferiority of product
  2. Inferiority of service
  3. Quality of product
  4. Quality of staff






Q2. Process capability ratio is expressed as:

  1. USL+LSL/6s
  2. USL-LSL/6s
  3. USL-LSL/3s
  4. USL-LSL/s
Correct Answer

Q3. For a c chart, the LCL comes out to be -.7. The value of LCL that should be used is:

  1. -.7
  2. 0
  3. 1
  4. None of the above
Correct Answer

Q4. The key process input variables (KPIV) and key process output variables are developed during the ______________ phase.

  1. Define
  2. Analyze
  3. Measure
  4. Improve
Correct Answer

Q5. A bar chart that depicts the frequencies of numerical or measurement data

  1. Sample
  2. Histogram
  3. Check Sheet
  4. Process Map
Correct Answer

Q6. The defect concentration diagram can be used in the ______________ stage of the DMAIC.

  1. Define
  2. Measure
  3. Analyze
  4. Improve
Correct Answer

Q7. Statistical Decision Making includes Pareto Analysis as a means of reducing errors in the total project process. Pareto Analysis ______________.

  1. compares the error rate with the pass rate to determine the allowable number of errors per 1,000
  2. compares the error rate of individuals to determine the compensation for bonuses
  3. is a method of rejecting errors or variances from standards following self-inspection
  4. is a procedure for ranking the errors to identify those contributing the most to failures [PMBOK p. B-2]
  5. counts errors or failures to determine the added cost of all operations that do not meet the requirements
Correct Answer

Q8. The major purpose of the Control Phase in DMAIC is to:

  1. Identify root causes
  2. Determine long term solutions
  3. Maintain the gains made with implemented solutions
  4. Calculate Cp and Cpk
Correct Answer

Q9. fourteen points framework for quality and productivity improvement was suggested by ______________

  1. Crosby
  2. Ishikawa
  3. Deming
  4. Juran
Correct Answer

Q10. Mistake proofing of process is done in the ______________ stage of DMAIC.

  1. Define
  2. Measure
  3. Improve
  4. Control
Correct Answer