IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

All of the following statements about acceptance sampling plans are true except:
  1. Acceptance sampling plans are necessary when destructive inspections are required
  2. Acceptance sampling plans do not directly control the quality of a series of lots; they instead specify the risk of accepting lots of given quality
  3. Acceptance sampling plans are not very effective for inspecting small lots of custommade products
  4. Acceptance sampling plans are beneficial when the cost of inspections is high and the resulting loss of passing non-conforming units is not great
  5. Acceptance sampling plans are never as effective at rejecting non-conforming units as 100 percent inspection, even when the inspection process is very tedious






Q2. Process capability ratio is expressed as:

  1. USL+LSL/6s
  2. USL-LSL/6s
  3. USL-LSL/3s
  4. USL-LSL/s
Correct Answer

Q3. The same quality control manager decides to increase his daily sample size from three to six. The size of the control band will:

  1. Increase
  2. Decrease
  3. Remain unchanged
  4. Not determinable from given data
  5. None of the above
Correct Answer

Q4. Self-inspection by the individual performing the work is used to achieve quality in a product. The advantages of self-inspection include ______________.

  1. minimization of end product repairs and material waste
  2. immediate feedback to permit adjustments to the process
  3. early identification of errors prior to further integration
  4. reduction in the number of end product inspections and tests
  5. all of the above
Correct Answer

Q5. Quality management includes forming and directing a team of people to achieve a qualitative goal within an effective cost and time frame that results in ______________

  1. a project completed in shortest possible time.
  2. a product or service that conforms to the required specifications.
  3. an award-winning product that brings public recognition to the project
  4. an innovative project that establishes qualification of the project team
Correct Answer

Q6. A researcher conducted a 2 x 2 completely repeated measures factorial design and planned 15 participants in each condition. How many participants would be required to conduct this experiment?

  1. 15
  2. 30
  3. 45
  4. 60
Correct Answer

Q7. If a researcher planned to have 20 participants in each condition of a 2 x 3 independent groups factorial design, how many participants would be needed for this experiment?

  1. 40
  2. 60
  3. 80
  4. 120
Correct Answer

Q8. For a process which is six sigma complaint, the percentage of products within specifications is:

  1. 95.20%
  2. 99.73%
  3. 99.10%
  4. 96.78%
Correct Answer

Q9. Q-Q plot is used to check:

  1. Normality of the dataset
  2. Number of defects
  3. Process mean
  4. Process standard deviation
Correct Answer

Q10. Validation of root cause is made only when which standard(s) is met:

  1. There is a statistically significant relationship between the suspected root cause and the effect.
  2. The data is normal
  3. Knowledge of the process corroborates this causal relationship.
  4. Both A and C above
Correct Answer










User Agreement| |Privacy Policy