IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

What is the purpose of ISO 9000:2015?
  1. Explains the fundamental concepts, principles and vocabulary of quality management
  2. Provides guidance on the application of ISO 9001:2015
  3. Provides guidance on how to achieve sustained success by a quality management approach
  4. An international standard which acts as a model for quality assurance






Q2. The ISO 9000 series is:

  1. an international standard that describes a recommended quality system
  2. intended to be applied only to manufactured products
  3. a set of instructions for preparing control charts
  4. a set of guidelines for quality
  5. a set of forms and procedures to ensure quality
Correct Answer

Q3. Consider that for a process s bar (average standard deviation of 50 samples each of size 4) is found to be 10.04. The value of c4 (corresponding to sample size of .4) is .92. What is the estimated value of process standard deviation?

  1. 10.91 (s bar/ c4 is an unbiased estimator of standard deviation)
  2. 11.89
  3. 12.67
  4. 9.67
Correct Answer

Q4. Quality management includes forming and directing a team of people to achieve a qualitative goal within an effective cost and time frame that results in ______________

  1. a project completed in shortest possible time.
  2. a product or service that conforms to the required specifications.
  3. an award-winning product that brings public recognition to the project
  4. an innovative project that establishes qualification of the project team
Correct Answer

Q5. The main purpose of a stratification plan is:

  1. To prove statistical validity
  2. Define categories to slice and dice the data
  3. Determine which statistical tool to use
  4. To identify solutions
Correct Answer

Q6. Which is not a commonly used quality management tool?

  1. Fishbone diagram
  2. CSSR report
  3. Pareto chart
  4. Control chart
  5. None of the above (all are commonly used)
Correct Answer

Q7. Effective quality control results in:

  1. Increase in customer satisfaction
  2. Lower cost
  3. None of the above
  4. Both a and b
Correct Answer

Q8. A sequence of 3 operations has first pass yield (right first time) rates as follows: 93%, 87% and 92%. The first pass yield rate is:

  1. 72%
  2. 74%
  3. 99%
  4. 87%
Correct Answer

Q9. If data for MR chat shows non-normality, it is better to determine the control limits for the individuals control chart based on the ______________ of the correct underlying distribution.

  1. Percentage
  2. Percentiles
  3. Rank
  4. Mean
Correct Answer

Q10. Bias reflects the:

  1. The differences in observed accuracy and/or precision experienced over the range of measurements made by the system.
  2. The difference between observed measurements and a "true" value obtained from a master or gold standard
  3. Different levels of variability in different operating regimes, resulting from warm-up effects, environmental factors, inconsistent operator performance
  4. None of the above
Correct Answer










User Agreement| |Privacy Policy