Question:

What does PDCA stand for?
  1. Plan, Design, Confirm, Act
  2. Plan, Do, Check, Act
  3. Prepare, Do, Critique, Appraisal
  4. Prepare, Do, Critique, Assess






Q2. The value of Var(3 - 4X) is:

  1. 5120 / 9
  2. 1280 / 81
  3. 5120 / 81
  4. 1280 / 9
Correct Answer

Q3. Statistical Decision Making includes Pareto Analysis as a means of reducing errors in the total project process. Pareto Analysis ______________.

  1. compares the error rate with the pass rate to determine the allowable number of errors per 1,000
  2. compares the error rate of individuals to determine the compensation for bonuses
  3. is a method of rejecting errors or variances from standards following self-inspection
  4. is a procedure for ranking the errors to identify those contributing the most to failures [PMBOK p. B-2]
  5. counts errors or failures to determine the added cost of all operations that do not meet the requirements
Correct Answer

Q4. TQM stands for ______________

  1. Total Quality Management
  2. Total Quantity Management
  3. Total Qualitative Management
  4. To question management
Correct Answer

Q5. The focal point of all quality control should be:

  1. Price focus
  2. Cost Focus
  3. Customer Focus
  4. Manufacturing Focus
Correct Answer

Q6. Taguchi suggested that loss in a process is'increased with increase in which of the following?

  1. Specifications
  2. Standards
  3. Competition
  4. Variability
Correct Answer

Q7. What does the transcendent view imply for high quality?

  1. It is something everlasting
  2. It is something timeless and enduring
  3. It is something priceless
  4. It is something perfect
Correct Answer

Q8. For a given sample size (n) and number of defects acceptable ©, the Average Total Inspection (of units) should ______________ with increase in N (lot size).

  1. Increase
  2. Decrease
  3. Remain Constant
  4. None of the above
Correct Answer

Q9. Nonconformance is an expense of:

  1. Profit of quality
  2. Defects of quality
  3. Quality of product
  4. Cost of quality
Correct Answer

Q10. Attribute charts may be used when:

  1. Several characteristics can be jointly measured
  2. When one particular quality characteristic is of importance
  3. Specific information like process mean is required
  4. None of the above
Correct Answer