IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs In Mirrors Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

R charts are used for controlling ______________ of a process.
  1. Central Tendency
  2. Dispersion
  3. None of the above
  4. Both a and b






Q2. Cost of quality includes:

  1. Cost of all work resulting from nonconformance to the requirements
  2. a and b
  3. all of the above
  4. Cost of all work to build a product or service that conforms to the requirements
  5. Training programs
Correct Answer

Q3. Check Sheet is used during ______________ stage of DMAIC.

  1. Define
  2. Measure
  3. Analyze
  4. Improve
Correct Answer

Q4. Consider that for a particular process, the p has shifted to .4 and the process has gone out of control. The corresponding value of beta is found to be .3356. The value of Average Run Length is:

  1. 2.5
  2. 1.5 ((1/1-beta) provides us with average run length)
  3. 1.0
  4. 2.7
Correct Answer

Q5. ______________ is the set of activities that ensures the quality levels of products and services are properly maintained and that supplier and customer quality issues are properly resolved.

  1. Quality Control
  2. Quality Management
  3. Quality Assurance
  4. Quality Planning
Correct Answer

Q6. The chart used for tracking number non-conforming is:

  1. P
  2. Np
  3. X bar
  4. None of the above
Correct Answer

Q7. Consider that for a process s bar (average standard deviation of 50 samples each of size 4) is found to be 10.04. The value of c4 (corresponding to sample size of .4) is .92. What is the estimated value of process standard deviation?

  1. 10.91 (s bar/ c4 is an unbiased estimator of standard deviation)
  2. 11.89
  3. 12.67
  4. 9.67
Correct Answer

Q8. A main role of the project Champion is to:

  1. Be a cheerleader for the team
  2. Remove roadblocks
  3. Perform statistical analysis
  4. Develop the control plan
Correct Answer

Q9. In DMAIC, redesigning of process to either remove bottlenecks or to reduce waste takes place in the ______________ stage.

  1. Define
  2. Measure
  3. Improve
  4. Control
Correct Answer

Q10. The defect concentration diagram can be used in the ______________ stage of the DMAIC.

  1. Define
  2. Measure
  3. Analyze
  4. Improve
Correct Answer










User Agreement| |Privacy Policy