Apart from Poisson distribution, another distribution that can be applied to events data is:
  1. Normal Distribution
  2. Geometric Distribution
  3. Lognormal Distribution
  4. Continuous Distribution






Q2. Just-in-time (JIT) is the concept of reducing inventories to:

  1. 25% of former stock
  2. Less than half of former stock
  3. 75% of peak stock
  4. zero stock
  5. 15% of the cost of the product for a planned stock
Correct Answer

Q3. An unbiased dice is rolled once. The probability of getting a number greater than 4 is:

  1. ¼
  2. 1/6
  3. ½
  4. 1/3
Correct Answer

Q4. The roof of house of quality shows the interrelationship between:

  1. Functional Requirements
  2. Design Attributes
  3. Service Process
  4. Manufacturing Process
Correct Answer

Q5. The primary responsibility for establishing design and test specifications should rest with

  1. manufacturing
  2. senior management
  3. procurement or purchasing
  4. engineering
  5. quality control
Correct Answer

Q6. An improvement process in which a company measures its performance against that of best-in-class companies, determines how those companies achieved their performance levels, and uses the information to improve its own performance

  1. Control Chart
  2. Six Sigma
  3. Cause and Effect Diagram
  4. Benchmarking
Correct Answer

Q7. In many projects, the end product is a "service" that does not have physical characteristics and attributes to be measured to ensure conformance to the requirement. When service is the end product of a project, measurements ______________.

  1. do not apply to the service, but the criterion is pass or fail
  2. are always artificial and present only false indications of progress
  3. can be established based on customer expectations and the responsibility assigned to individuals
  4. are not applicable if the service is to an internal function of the project
  5. relate only to the actual expenditures of funds or receipt or revenues
Correct Answer

Q8. Identify the charts which might give an indication of process going out of control (before the process has actually changed)

  1. X bar and c
  2. P and c
  3. R and u
  4. X bar and R
Correct Answer

Q9. Quality planning is:

  1. evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards
  2. taking action to increase the effectiveness and efficiency of the project so as to provide added benefits to both the performing organization and the project customer
  3. assuring the production of goods that meet the highest standards of luxury
  4. identifying which quality standards are relevant to the project and determining how to satisfy them
  5. monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance
Correct Answer

Q10. Statistical Process Control is used in quality programs to determine whether repetitive operations meet predictable standards. The process uses ______________ to permit accurate monitoring of the operation.

  1. 100 percent inspection and random rejection
  2. acceptance sampling and automatic rejection
  3. continuous sampling and error detection methods
  4. random sampling and corrective procedures
  5. statistical sampling and control procedures