Question:

According to current quality management thinking, which of the following approaches to quality improvement is least likely to produce positive results?
  1. increased inspection
  2. continuous improvement
  3. quality circles
  4. statistical quality control
  5. use of worker suggestion systems






Q2. If only ______________ causes of variation are present, the output of a process forms a distribution that is table over time and is predictable.

  1. Assignable
  2. Non-Random
  3. Natural
  4. Cannot be said
Correct Answer

Q3. A Belt utilized a diamond symbol in a Process Map she created for the process that was subject to her LSS project. By use of the diamond symbol she was showing a(n) _______________ point in the process

  1. Ending
  2. Beginning
  3. Decision
  4. Repair station
Correct Answer

Q4. Consider that for a particular process, the p has shifted to .4 and the process has gone out of control. The corresponding value of beta is found to be .3356. The value of Average Run Length is:

  1. 2.5
  2. 1.5 ((1/1-beta) provides us with average run length)
  3. 1.0
  4. 2.7
Correct Answer

Q5. ______________ is the set of activities that ensures the quality levels of products and services are properly maintained and that supplier and customer quality issues are properly resolved.

  1. Quality Control
  2. Quality Management
  3. Quality Assurance
  4. Quality Planning
Correct Answer

Q6. A histogram ordered by frequency of occurrence that shows how many results were generated by each identified cause is:

  1. Pareto Diagram
  2. Statistical Histogram
  3. Juran Histogram
  4. Fishbone Diagram
Correct Answer

Q7. Cost of quality includes:

  1. Cost of all work resulting from nonconformance to the requirements
  2. a and b
  3. all of the above
  4. Cost of all work to build a product or service that conforms to the requirements
  5. Training programs
Correct Answer

Q8. Which of the following is not part of the Total Quality Approach?

  1. holistic thinking
  2. focus on short-term financial performance
  3. focus on desirability
  4. team thinking
Correct Answer

Q9. The four phases of the Shewart cycle are:

  1. Plan, Do, Scan, Implement
  2. Plan , Act , Do, Control
  3. Plan, Do, Check, Act
  4. Implement, Design, Control, Plan
Correct Answer

Q10. What is the relationship between Ishikawa and Deming?

  1. Grandson and grandfather
  2. Son and father
  3. Nephew and uncle
  4. Student and teacher
Correct Answer