IRGST

Home Question Bank Online Exams Job Interview Q&A Job Description How To Quotes and Sayings Articles Jobs Personality Tests Personality Types About Contact Us Sign in/up

Quality Question Bank
for Exam preparation

Select Knowledge area

Question:

A fundamental tenet of modern quality management holds that quality is most likely to be achieved:
  1. by planning it into the process
  2. by developing careful mechanisms to inspect for quality
  3. by developing prestigious products and processes
  4. by striving to do the best job possible
  5. by conducting quality circle activities






Q2. When the number of defects is low, which of the following is true:

  1. We should use c or u chart
  2. Most samples will have non-zero defects
  3. Create a time between occurrence control chart
  4. None of the above
Correct Answer

Q3. A simple experimental design with two levels of an independent variable cannot

  1. detect a curvilinear relationship between variables.
  2. detect a monotonic relationship.
  3. reveal a positive relationship.
  4. show a negative relationship outcome.
Correct Answer

Q4. Cost of quality includes:

  1. Cost of all work resulting from nonconformance to the requirements
  2. a and b
  3. all of the above
  4. Cost of all work to build a product or service that conforms to the requirements
  5. Training programs
Correct Answer

Q5. Quality control is the technical processes that ______________ the project's progress against the performance standards.

  1. examine, analyze, and report
  2. inspect, certify, and verify
  3. inspect, examine, and determine
  4. identify, measure, and report
  5. reveal, establish, and record
Correct Answer

Q6. The main purpose of the Define Phase is to:

  1. Select a project
  2. Get agreement on the project’s purpose, goals and opportunity
  3. Select a team
  4. Decide on which data to collect
Correct Answer

Q7. A bar chart that depicts the frequencies of numerical or measurement data

  1. Sample
  2. Histogram
  3. Check Sheet
  4. Process Map
Correct Answer

Q8. In DMAIC, redesigning of process to either remove bottlenecks or to reduce waste takes place in the ______________ stage.

  1. Define
  2. Measure
  3. Improve
  4. Control
Correct Answer

Q9. Crosby’s approach to management is

  1. ISO
  2. A problem that can never be solved
  3. Absolutes of Quality Management
  4. Interim Management
Correct Answer

Q10. Crosby’s approach to management is:

  1. A problem that can never be solved
  2. Absolutes of Quality Management
  3. Interim Management
  4. ISO
Correct Answer










User Agreement| |Privacy Policy