Quality - Question 1:

For a set of data, the average squared deviation from the mean, with a denominator of n-1

  1. Sample Variance
  2. Normal Distribution
  3. Sample
  4. Population






Quality- Q2. What does PDCA stand for?

  1. Plan, Design, Confirm, Act
  2. Plan, Do, Check, Act
  3. Prepare, Do, Critique, Appraisal
  4. Prepare, Do, Critique, Assess
Correct Answer


Quality- Q3. In a normal distribution 68% of the data will occur within...

  1. +/- 2 standard deviations
  2. +/- 1 standard deviation
  3. +/- 3 standard deviations
  4. Outside the bell-shaped curve
Correct Answer


Quality- Q4. Total quality costs include:

  1. Prevention costs
  2. Appraisal costs
  3. Failure costs
  4. All of the given options
Correct Answer


Quality- Q5. Quality assurance

  1. refers to the prevention of product defects
  2. A and B
  3. B and C
  4. is an auditing function that provides feedback to the project team and client about the quality of output being produced
  5. is the technical process that includes the construction of control charts which specify acceptability limits for conforming output
Correct Answer


Quality- Q6. The ______________ sum of squares measures the variability of the observed values around their respective treatment means.

  1. treatment
  2. error
  3. interaction
  4. total
Correct Answer


Quality- Q7. The same quality control manager decides to increase his daily sample size from three to six. The size of the control band will:

  1. Increase
  2. Decrease
  3. Remain unchanged
  4. Not determinable from given data
  5. None of the above
Correct Answer


Quality- Q8. The cost of quality is needed to identify opportunities for improvement. The cost of quality is, therefore, defined as the dollar value associated with ______________.

  1. producing a product that meets the requirement
  2. nonconformance to the requirement
  3. any cost for quality personnel and tools
  4. any extra cost to hire a quality consultant
  5. all extra efforts to implement a quality program
Correct Answer


Quality- Q9. After E.deming, who is considered to have the greatest impact in quality management?

  1. Kauro Ishikawa
  2. Joseph M. Juran
  3. W.E. Deming
  4. Genichi Tagucchi
Correct Answer


Quality- Q10. Measurement accuracy is attained when...

  1. Different people get the same result when measuring the same item or characteristic.
  2. The same person taking multiple measurements on the same item or characteristic gets the same results every time.
  3. The measured value has little deviation from the actual value.
  4. When the resolution of the measurement instrument can give at least 5 distinct values in the range being measured.
Correct Answer